contract

  • GEOTHERMAL DRILLING
  • OIL DRILLING
  • WELL SERVICE RIG
  • EXPLORATION
  • WORKOVER RIG
  • GEOTHERMAL DRILLING
  • WORKOVER RIG
  • WORKOVER RIG
  • WORKOVER RIG
  • WORKOVER RIG
  • WORKOVER RIG
  • WORKOVER RIG
  • OIL DRILLING
  • WORKOVER RIG

Location

  • DIENG
  • JAMBI
  • LIRIK
  • JAMBI
  • LIMAU, SUMBAGSEL
  • KAMOJANG
  • PENDOPO
  • DURI
  • PETAPAHAN
  • DURI
  • PENDOPO
  • JATIBARANG
  • JATIBARANG
  • MINAS

Duration

  • 1 Year (1991 - 1992)
  • 3 Years (1992 - 1995)
  • 2 Years (1993 - 1995)
  • 2 Years (1993 - 1995)
  • 1 Year (1993 - 1994)
  • 1 Year (1995 - 1996)
  • 2 Years (1995 - 1997)
  • 4 Years (2000 - 2004)
  • 6 Months (2003 - 2004)
  • 4 Years (2005 - 2009)
  • 2 Years (2008 - 2010)
  • 6 Months (2010)
  • 4 Months (2010)
  • 4 Years (2011 - 2015)

client

  • PERTAMINA UNIT EP III
  • PERTAMINA UEP JAMBI
  • PERTAMINA UEP-II
  • PERTAMINA OEP
  • JOB PERTAMINA HUSKY LIMAU
  • PERTAMINA EP. KAMOJANG
  • JOB PERTAMINA SURYARAYA TELADAN
  • PT. CALTEX PACIFIC INDONESIA
  • PT. CALTEX PACIFIC INDONESIA
  • PT. CHEVRON PACIFIC INDONESIA
  • KSO PERTAMINA SUMATERA ENERGY
  • PT. PERTAMINA EP
  • PT. PERTAMINA EP
  • PT. CHEVRON PACIFIC INDONESIA

  • The Three Towers

    Full working three rig towers at Minas

  • Dedicated crew

    A crew checking at equipment on truck

  • Preparing the Rig

    To ensure everything is working

  • It's Drilling Time

    Arthindo Crew operates the Drill